Author Topic: NASA plans June reattempt of moon rocket dress rehearsal  (Read 195 times)

0 Members and 1 Guest are viewing this topic.

Online Buster's Uncle

  • With community service, I
  • Ascend
  • *
  • Posts: 49412
  • €131
  • View Inventory
  • Send /Gift
  • Because there are times when people just need a cute puppy  Soft kitty, warm kitty, little ball of fur  A WONDERFUL concept, Unity - & a 1-way trip that cost 400 trillion & 40 yrs.  
  • AC2 is my instrument, my heart, as I play my song.
  • Planet tales writer Smilie Artist Custom Faction Modder AC2 Wiki contributor Downloads Contributor
    • View Profile
    • My Custom Factions
    • Awards
NASA plans June reattempt of moon rocket dress rehearsal
« on: May 07, 2022, 04:25:28 PM »
NASA plans June reattempt of moon rocket dress rehearsal
Andrew Wulfeck - Yesterday 11:57 PM
Fox Weather



KENNEDY SPACE CENTER, Fla. – NASA says it will again attempt a dress rehearsal of their mega moon rocket after undergoing weeks of inspections and repairs inside the Vehicle Assembly Building at the Kennedy Space Center.

The agency recently announced it is planning to roll back the Artemis I Space Launch System (SLS) rocket and Orion spacecraft in late May and attempt the wet dress rehearsal in June.

In April, three attempts to finish the test were marred by technical issues that forced engineers to roll the 322-foot-tall back to the VAB.

NASA says while back inside the facility engineers replaced a faulty helium check vale and conducted leak checks.

During the wet dress rehearsal, 700,000 gallons of super-cold fuel will be loaded into the rocket, and personnel will perform tasks similar to what a launch day requires.

Once the test is complete, the rocket and spacecraft will be rolled back to the VAB to be readied for a future launch.

NASA has not ruled out an August launch attempt; however, any additional delays could put that timeline in jeopardy.

The Artemis I mission will orbit the moon and return to Earth without a crew.

If the program is successful, a crewed mission to the moon could be conducted by 2025.


https://www.msn.com/en-us/news/technology/nasa-plans-june-reattempt-of-moon-rocket-dress-rehearsal/ar-AAX0jmi?ocid=winp1taskbar&cvid=6a38b82d93114f2ea81c04e50cb87ece

Offline Geo

Re: NASA plans June reattempt of moon rocket dress rehearsal
« Reply #1 on: May 08, 2022, 03:08:14 PM »
That's a lot of liters...

 

* User

Welcome, Guest. Please login or register.
Did you miss your activation email?


Login with username, password and session length

Select language:

* Community poll

SMAC v.4 SMAX v.2 (or previous versions)
-=-
24 (7%)
XP Compatibility patch
-=-
9 (2%)
Gog version for Windows
-=-
103 (32%)
Scient (unofficial) patch
-=-
40 (12%)
Kyrub's latest patch
-=-
14 (4%)
Yitzi's latest patch
-=-
89 (28%)
AC for Mac
-=-
3 (0%)
AC for Linux
-=-
6 (1%)
Gog version for Mac
-=-
10 (3%)
No patch
-=-
16 (5%)
Total Members Voted: 314
AC2 Wiki Logo
-click pic for wik-

* Random quote

When beholding the tranquil beauty and brilliancy of the ocean's skin, one forgets the tiger heart that pants beneath it; and would not willingly remember that this velvet paw but conceals a remorseless fang.
~Herman Melville, ‘Moby Dick’, Datalinks

* Select your theme

*
Templates: 5: index (default), PortaMx/Mainindex (default), PortaMx/Frames (default), Display (default), GenericControls (default).
Sub templates: 8: init, html_above, body_above, portamx_above, main, portamx_below, body_below, html_below.
Language files: 4: index+Modifications.english (default), TopicRating/.english (default), PortaMx/PortaMx.english (default), OharaYTEmbed.english (default).
Style sheets: 0: .
Files included: 45 - 1228KB. (show)
Queries used: 36.

[Show Queries]