Author Topic: Europe's 2016 Mars Mission Enters Final Construction Phase  (Read 729 times)

0 Members and 1 Guest are viewing this topic.

Online Buster's Uncle

  • With community service, I
  • Ascend
  • *
  • Posts: 49678
  • €833
  • View Inventory
  • Send /Gift
  • Because there are times when people just need a cute puppy  Soft kitty, warm kitty, little ball of fur  A WONDERFUL concept, Unity - & a 1-way trip that cost 400 trillion & 40 yrs.  
  • AC2 is my instrument, my heart, as I play my song.
  • Planet tales writer Smilie Artist Custom Faction Modder AC2 Wiki contributor Downloads Contributor
    • View Profile
    • My Custom Factions
    • Awards
Europe's 2016 Mars Mission Enters Final Construction Phase
« on: June 18, 2013, 07:45:41 pm »
Quote
Europe's 2016 Mars Mission Enters Final Construction Phase
By Mike Wall | SPACE.com – 7 hrs ago...


The ExoMars Trace Gas Orbiter, along with an Entry, Descent and Landing Demonstrator Module (EDM), form the first mission in the European-led ExoMars program. The Orbiter and EDM are scheduled to arrive at Mars in 2016.

 
Europe's next mission to Mars has passed a key milestone to enter its final construction phase in pursuit of a planned 2016 launch toward the Red Planet.

European Space Agency officials signed the last construction contract for the 2016 ExoMars mission today (June 17), a deal between ESA and the Mars orbiter's prime contractor Thales Alenia Space. The ExoMars orbiter mission aims to send a methane-sniffing orbiter and a landing demonstrator to the Red Planet.

"The award of this contract provides continuity to the work of the industrial team members of Thales Alenia Space on this complex mission, and will ensure that it remains on track for launch in January 2016," Alvaro Giménez, ESA's director of science and robotic exploration, said in a statement.

The ExoMars mission, a partnership between ESA and the Russian space agency Roscomos, aims to search for signs of past or present life on Mars. Two launches are planned, one in 2016 and another two years later.

The 2016 portion of the mission includes two main components — the Trace Gas Orbiter, which will hunt for methane and other atmospheric gases that could be produced by lifeforms on the Red Planet; and the Entry, Descent and Landing Demonstrator Module, which will prove out technologies needed for the 2018 phase and future Mars missions.

The main piece of the 2018 launch is a rover capable of drilling 6.6 feet (2 meters) into the Red Planet dirt. Scientists are keen to collect samples from such depths, which are sheltered from the cold, dry and radiation-bombed Martian surface.

The new contract with Thales Alenia Space is worth about 230 million euros ($307 million at current exchange rates), Space News reported. ESA's financial obligation for the entire two-launch ExoMars mission is 1.2 billion euros ($1.6 billion), agency officials have said.

ExoMars was originally conceived as a partnership involving ESA and NASA, but budget cuts led to the U.S. space agency's withdrawal from the project in 2012. Roscosmos filled NASA's shoes earlier this year, coming onboard to provide science instruments and other mission components, including the rockets for both launches.
http://news.yahoo.com/europes-2016-mars-mission-enters-final-construction-phase-110342353.html

 

* User

Welcome, Guest. Please login or register.

Login with username, password and session length

Select language:

* Community poll

SMAC v.4 SMAX v.2 (or previous versions)
-=-
24 (7%)
XP Compatibility patch
-=-
9 (2%)
Gog version for Windows
-=-
104 (33%)
Scient (unofficial) patch
-=-
40 (12%)
Kyrub's latest patch
-=-
14 (4%)
Yitzi's latest patch
-=-
89 (28%)
AC for Mac
-=-
3 (0%)
AC for Linux
-=-
6 (1%)
Gog version for Mac
-=-
10 (3%)
No patch
-=-
16 (5%)
Total Members Voted: 315
AC2 Wiki Logo
-click pic for wik-

* Random quote

Those who don't believe we can create the perfect man or woman from pixels and light; overestimate the capacity of their senses.
~J. Croft, Morgan Starworks, Ltd.

* Select your theme

*
Templates: 5: index (default), PortaMx/Mainindex (default), PortaMx/Frames (default), Display (default), GenericControls (default).
Sub templates: 8: init, html_above, body_above, portamx_above, main, portamx_below, body_below, html_below.
Language files: 4: index+Modifications.english (default), TopicRating/.english (default), PortaMx/PortaMx.english (default), OharaYTEmbed.english (default).
Style sheets: 0: .
Files included: 45 - 1228KB. (show)
Queries used: 35.

[Show Queries]