Hurry
The formula for calculating the cost of hurrying production. M: Number of Minerals needed to complete the item, Mineral row: One mineral row = 10 × Industry Minerals
Base Facility—2 × M (doubled if the number of minerals in the production box is less than 10)
Secret Project—4 × M (doubled if the number of minerals in the production box is less than four mineral rows)
Unit—ROUND DOWN(M × (2 + M ÷ 20) )
Partial—ROUND UP(Hurried Minerals × Full Hurry Cost ÷ M) (doubled if the number of minerals in the production box is less than 10)