Hurry
Base Facility Hurry Cost = 2 * M
Doubled if the number of minerals in the production box is less than 10.
Secret Project Hurry Cost = 4 * M
Doubled if the number of minerals in the production box is less than 4 mineral rows.
Unit Full Hurry Cost = ROUND DOWN(M * (2 + M / 20) )
Partial Hurry Cost = ROUND UP(Hurried Minerals * Full Hurry Cost/M)
Doubled if the number of minerals in the production box is less than 10.
M: Number of Minerals needed to complete the item.
mineral row: One mineral row = 10 * INDUSTRY modifier minerals