Difference between revisions of "Aquifer"

From Alpha Centauri Wiki
Jump to: navigation, search
(CSV import)
 
m (Removed bug report)
 
Line 1: Line 1:
 
{{improvementinfobox|turns=18|preq=EcoEng}}
 
{{improvementinfobox|turns=18|preq=EcoEng}}
'''Drilling to an aquifer''' creates a new river beginning in its square.
+
Drill to '''Aquifer''' taps an underground source of water to create a new river beginning from the same square. it is not possible adjacent to an existing river.
* This operation is not allowed in squares adjacent to an existing river.
+
* '''Bug Report:'''
+
*It is possible to create rivers in adjacent squares by performing the drill to aquifer operation in multiple squares at the same time.
+

Latest revision as of 16:51, 30 April 2013

Drill to Aquifer taps an underground source of water to create a new river beginning from the same square. it is not possible adjacent to an existing river.
Aquifer
Requires Ecological Engineering
Turns 18